Picture
The front facade is almost done - the porch and garage extension were added. Also,the entire roof has tar paper on it.
Picture
The doghouse for the fireplace is in its proper place, which is the side of the house. By default, it would be in the back of the house, but I value backyard/patio real estate more than side yard real estate.. Plus, I'll be able to see the fireplace from the kitchen.
Picture
The back of the house is close to looking like it should. The hole where the fireplace would've gone has been closed up, and the outline of the kitchen paladian window is almost complete.
Picture
They've installed the basement stair railing.
Picture
The extension part of the garage got a second steel beam. I'm assuming they'll encase the first one in wood just like they id the second beam so that they can put dryywall over it.
Picture
Alright, I was naughty and I stood in the hall from where you enter from the garage - they've installed the stairs! I'm guessing those are the final treds that haven't been stained yet since they're taking care to protect them with plastic.
Picture
This is actually my neighbor's garage - boy am I glad I didn't need to have my steps turned sideways like this. (Zoom in on the first pic to see that I have 3 front facing steps). This takes up so much room in the garage, and they didn't get the garage extension either. I'm posting this difference because the number of steps going from the garage to the house was NOT something I thought to ask about, but clearly is something that can make a big difference. However, my neighbors obviously have a higher garage ceiling, so they could easily install a car lift if they wanted to.
 
Picture
Except for over the extension I got on the garage, the roof is completely on! (albeit, the roof is still naked)
Picture
Note the hole for the skyligh. I wonder if like the basement windows, the sky lightwindow will go in before the rest of the windows, perhaps when they actually put tar paper and shingles on the roof.
 
Sorry I didn't get pictures of all four sides of the house. I ran into one of the construction workers who was installing windows in my neighbor across the street's house, and he was very kind. We got to talking and I honestly forgot that I hadn't gone all the way around the house. He commented that "This is the fun part, when the house is in framing". He also offered up the information that my windows were delivered today and that they should be installing them next week. I got the impression that he liked seeing a homeowner who is admiring his work, especially since he initiated the conversation. I could definitely tell he takes pride in his work. After all, this was after 6pm in the evening.  
 
Picture
Yay, walls! And even a tiny bit of the roof has been started. It's supposed to storm tomorrow though, and they probably won't have the rest of the roof up before it starts. Then again, they seem to have done everything ele lickity split!
 
Picture
The first floor ceiling/second floor floor is completely in. I think it's funny that they even put up caution tape, since it's not like it would keep a man from falling off.
Picture
Some material has already made its way up and is just waiting to be made into walls.
Picture
I didn't know that steel I-beams would be used anywhere outside of the basement. This one is in the garage and is sitting atop of the wood framing.
 
Today marks the 1 month anniversary of when ground was broken on my house. The lumber was due to arrive two days ago, but that evening, there wasn't anything new to take pictures of. Yesterday I didn't get a chance to visit the home site, but today I see there's been lots of progress made. There's no rain in the forecast, so hopefully the house will be under roof and/or wrapped in house wrap before the next time it rains. My neighbors were framed and under roof in about a week and a half, maybe two, though their house still isn't wrapped yet.
I figure it may be dangerous to step around the framing, so I didn't go inside the house, including the basement. I could see that nails and other materials were left about, and it's obvious that not all the walls are fully supported yet.
I also figured out that my house faces NE because I was out there around 6:30pm. (Yes, the plat drawing has a compass on it too) I'm pleased as pie. That means that the loft will get the morning sun and not the master bedroom and the back of the house, which has the most windows, will be lit indirectly (so not overwhelmingly) in the afternoon and evenings. 
Picture
The front of the house, from my "usual" corner Those are my two living room windows, and hidden by the garage wall is the front entrance.
Picture
The side of the house that doesn't have a neighbor yet (it's the model's parking lot) That window will be the dinning room window. Again, I chose not to do a bay window since I think a bay window is great for a view, but not when that view is just your neighbor. That "notch" in the middle is where the stairs will go.
Picture
The back of the house. You can see where they still have to frame out the Palladian windows for the kitchen. The patio door is in the middle and the great/family room is to the left of that. They've framed the standard configuration for the fireplace to go between the two windows, but my fireplace will be on the side of the house The project manager warned me that I'd probably see the standard configuration before they put in my customizations, so I won't raise any alarm bells just yet.
Picture
My one complaint about this neighborhood is how close they squeeze the houses together. There's about 15 feet here between my house and my neighbor's. I'll have 16 feet or so between my other neighbor (right now it's the parking lot for the model) I'm glade I decided NOT to do a bay window for that office. We're close enough as is, and a bay window would've just put me 2 feet closer and given my neighbors 2 more angles to peer through my window. I'll have to play some good porn on my computer to entertain them until I can get some window treatments in there ;)
Picture
Not sure what this plastic is. Probably more water protection, which I certainly won't complain about!
Picture
I wondered how they would secure the wood framing to the cement foundation. Remember those threaded posts sticking up from the foundation? They used those to bold the base of the wood framing to the foundation.
Picture
It looks like a basement now! Like the rest of the house though, I didn't go inside, just in case things aren't quite finished and supported yet.
Picture
You can see that they've started the ceiling/second floor
 
The prject manager told me via email on Thursday that they had just poured my garage floor, basement floor and stairs that morning, so the concrete is actually about two days old at this point but I didn't have time to get out there during daylight hours until today. And of course, it wasraining, but the project manager also told me that the lumber is due to be delivered on the 11th (just 3 days!) and I didn't want to miss the opportunity to take pictures while the house is in this phase.
Picture
Doesn't it just look so pretty?! And yes, these pictures were all taken in the rain...
Picture
I'm standing in the doorway, at the bottom of the basement steps. I didn't go in though because I was leaving a trail of muddy footprints. The builder probably already knows that I'm walking around the house, and the rain probably would wash the trail away,but I was getting soaked, so I was trying to make it quick.
Picture
The infamous sump pump. I took this while standing on the garage floor, looking down.
Picture
If you look closely, you can see my muddy footprint trail on the stairs. Also, I'm not sure if I should be worried that water that has clearly come into contact with dirt has found it's way to that corner of the basement. Then again, I just don't know if there was dirt down on the floor before it started to rain.
 
Picture
Not sure why there's a new hole for what looks like will be a beam footer because I thought the concrete patch under the two circle things was where the support beam would go, but apparently not.Also, I don't have a clue what those two circular things are.
Picture
The steps are formed. My paperwork said I'd have approximately 6 risers (steps), but it looks like in actuality I'll have eight.
 
Picture
Nothing really new or interesting today, just a mound of gravel in my driveway. I'm guessing it's in preparation for the concrete foundation pour.
 
Picture
Not quite sure who could fit through that window..., bu at least water won't be collecting around it. I hope they put some sort of grate over the black tube so I won't have to worry about it getting clogged as much.
Picture
The drain that will be at the bottom of the walk-up stairs is in place