Exciting stuff!  The entire interior has been painted, and all the interior doors have been hung except for the sliding closet doors in the bedrooms. The interior molding/trim has also been installed. All of the cabinets except for the ones that will be behind the bar are in, and all of the sink tops except for the master bath's' which is granite are in.  On the outside, the whole house has siding, and most of the shutters have been installed. I also now have garage doors. The project manager saw me taking these pictures and told me that next week they'll be doing the ceramic work, which means tiles in the bathrooms!
Picture
The exterior is almost complete. Just a few minor details left.
Picture
Siding has been installed. Sadly, I see one of my windows was broken during the course of construction, but I hear that's not uncommon and I know Toll will replace it before closing.
Picture
A closer look at the shutters.
Picture
The bar area with paint. There were a few of the cabinets behind the bar, but not yet installed. The remainder of the cabinets are still in the garage.
Picture
A view of hte painted kitchen with the cabinets and island installed.
Picture
A view of the family room, painted.
Picture
I see they've left a gap between the floor and the base molding, I assume so that the flooring can go under it.
Picture
The cabinets and sinks for the main upstairs hallway bath. All of the cabinets for the bathrooms have been installed, and all the sink tops except for the master bath which is granite instead of cultured marble have also been installed.
10/4/2013 11:28:12 pm

I glad to read your post and it's have nice content and interesting blog. I appreciate your work; really it's a very informative post.

Reply
10/29/2013 05:13:36 pm

Nice pictures and nice information too.

Reply
10/21/2017 10:49:29 am

I wanted to thank you for this great read!! I definitely enjoying every little bit of it I have you bookmarked to check out new stuff you post.

Reply



Leave a Reply.