Sorry about the picture quality. I managed to get to the house in the last remaining moments of daylight, so the basement pictures were practically taken in the dark.  Speaking of basement, the tile in the bar area has been laid, and the bar cabinets are in. All of the toilets and sink faucets are in along with most of the shower heads and controls. The doors have door knobs, and the stair banisters and railing are in, but not yet stained to match the hardwood. Finally, most of the kitchen back splash has been installed, and there is finished drywall in the garage (left unpainted).
Picture
The tiled area of the bar (the rest will be carpet). I'll try to get there this weekend to take a picture when there's more daylight and less camera flash so you can see the true color of the tile.
Picture
The cabinets in the bar area are in.
Picture
All of the bathroom toilets and faucets are in. This is the basement bathroom. I didn't try to run any water just in case any silicone or seal was still setting. Also note the door knob.
Picture
Most of the kitchen backsplash is in. I've got a stainless steel hood that will go in the gap between the cabinets. I can't wait until the protective blue film is removed from the counter top and I can see the complete picture. The wires still hanging down beneath the cabinets is for the under cabinet lighting.
Picture
The kitchen faucet has been installed.
Picture
The dual shower heads. They still have one more diverter to install.
Picture
"Finished" garage. I've got some painting to do.