Happy Thanksgiving everyone. I stopped by the house and I saw huge amounts of progress. About 75% of the tile work has been completed, with only the bar area, a listello in the hall bathroom and the kitchen backsplash remaining to be done. The kitchen sink and countertops have been installed, and the granite countertop in the master bath has also been installed.
I didn't notice anything new done to the house, but take a look at the sidewalk that's been poured. It's been poured for my neighbor as well, who has the corner lot.
The quartz countertops have been installed. I'll have to talk to the project manager, because the island should have a 12" overhang. I'm not worried because I know they'll fix it with no gripes, but I'm pretty sure they'll have ot re-order the slab.
A view of the true color of the quartz. (The blue film is there to protect the surface)/
Stair railing and ballisters are in my garage.
The basement bath tile work.
The tile work for the hall bathroom. THe listello has yet to be installed.
The guest bedroom tile work. The main tile is the same as for the hall, but the listello and sink tops are different.
The master bathroom
A shot of the master bathroom shower.