While there haven't been any change to the outside of the house, work has been progressing on the inside of the house. I didn't post new pictures all this week, because each time I went by after 5pm, the contractor was still there, including yesterday which was Saturday. Today, I got inside and saw that a lot, maybe all, of the HVAC duct work has been installed. I also saw the sprinkler system has been installed.
Picture
What will be one of the sprinkler heads in the first floor ceiling.
Picture
A view into the attic.
Picture
Another view into the attic. Though, the sprinkler line caught my attention here. I'm not sure why one board is above it, and another is purposefully nailed below it. I would think it would be consistent. I'll try to remember to ask about this at my next walk thru.
Picture
My basement furnace and AC unit (there should be another one in the attic, though I didn't see it yet.) It''s much wider than the one in the model as I recall. Also, see the studs that they detached from the ceiling in order to run the overhead duct work? I'm guessing the framer will be coming back. I can't imagine what will be the basement bathroom walls being hung on a lone middle stud like that.
Picture
See, the HVAC stuff blocks the sump pump. There's maybe 18 inches to get around and access it. I hope that's enough room for a serviceman to get himself and any equipment needed in should I need to call one in the future.
Picture
This is the label for my windows - a reader asked what kind of windows I have, so I figured this would be the best way to answer that question.
5/2/2013 11:08:31 pm

I am so happy after the visit of this blog because it contains an informative and amazing post which i liked very much...

Reply



Leave a Reply.