So, nothing has changed on the outside of the house, but on the inside, the walls sure are getting full!  Here's a sampling of what I saw when I visited yesterday.
Picture
The last two windows have arrived and are sitting in the garage, waiting to be installed.
Picture
The ceiling of the office. You can see the type of recessed cans they're using. Directly above is the soaking tub in the master bathroom.
Picture
They've clearly labeled my radon system pipes.
Picture
They've filled in the cracks around the windows with some type of expanding foam. I also see this stuff in some of the holes they cut to run the wires. They aren't quite done yet, so I'm sure I'll see more of it.
Picture
A view of the kitchen wiriring. The three circular boxes in the ceiling will hold pendent lights over the island, and there are recessed lights throughout. Also, you can see the vent for the hood, and though you can't see it in this picture, directly below it the gas line is coming up through the floor.
Picture
Master bathroom with the soaking tub installed. and they've corrected the width of the shower (made it wider). Note that the tub spigots are off to the side so I don't have to step over them to get in the tub.
Picture
IN the basement, where they're going to put my structured wiring panels (one for cat5 and hdmi, and another for security)
10/1/2013 02:24:09 pm

Thanks for your great post. I have read your post completely and acquire more knowledge from this article.

Reply
12/16/2015 12:33:20 am

Wow! What an eye opener this post has been for me. Very much appreciated, bookmarked, I can’t wait for more!

Reply



Leave a Reply.